The port of Izmir berth and gang planning meeting is held from Monday to Saturday between 14.30 and 15.30. The planning of sundays and official holidays in made as to cover the second gang of the following working day.
Last update : 23.07.2010 16:45
| Daily Vessel Positions of Port of Izmir | Date: | 24.07.2010 | ||||||||
| Day: | Saturday | |||||||||
| SHIP NAME | SHIFS | OPERATION | CARGO | |||||||
| B | ||||||||||
| E | ||||||||||
| R | ||||||||||
| T | III. Shift | I. Shift | II. Shift | Cargo Type |
L/D | |||||
| H | 16.00 - 24.00 | 00.00 - 08.00 | 08.00 - 16.00 | TON/QNT | ||||||
| NO | Gang | Crane | Gang | Crane | Gang | Crane | ||||
| 9 | Sanem | PN | PN | PN | PN | PN | PN | Loading | B.Cement | 6165mts |
| 11 | Davut-1 | - | - | 1 | EKS | 1 | EKS | Discharging | B.Clay | 2800mts |
| 12 | Kaptan Adem | 1 | EKS | - | - | - | - | Discharging | B.Clay | 880mts |
| 13 | Unlassent | 2 | MHC GK |
1 | GK | 2 | GK | L+D | Container | 315+ 185- |
| 14 | Ceyla-K | 1 | GK | 1 | GK | - | - | L+D | Container | 132+ 113- |
| 16 | Cap Vilano | 1 | GK | 1 | GK | 1 | GK | L+D | Container | 320+ 140- |
| 17 | MSC Dmphna | 3 | MHC 2GK |
2 | MHC 2GK |
- | - | L+D | Container | 420+ 19- |
| 17 | MSC Maria Laura | - | - | 2 | MHC GK |
2 | MHC GK |
L+D | Container | 455+ 80- |
| 19 | Diane-A | - | - | 2 | MHC GK |
2 | MHC GK |
L+D | Container | 155+ 256- |
| Y/S | Sealo-1 | PN | PN | PN | PN | PN | PN | Loading | B.Cement | 21000mts |
| Y/S | Santa Maria | PN | PN | PN | PN | PN | PN | Loading | Cement | 4200mts |
| Y/S | Little Princess | - | - | - | - | KNV | KNV | Loading | B.Poz. Stone | 7850mts |
| ABBREVIATIONS | ||
| Y/S: New Silo (New Berths) | L+D: Loading and Discharging | (+): Loading Quantity |
| KRY: Crane | GK: Gantry Crane | (-): Discharging Quantity |
| EKS: Excavator | MHC: Mobile Harbour Crane | GV: Vessel Crane |
| COLS: 15T SWL Coles Crane | KND: Own Possibilities | PN: Pneumatic |
| KNV: Conveyor Belt | KAV: Grab | KV: Shore Crane |
| YV: Floating Crane | BR: Berthing | FI: Idle Waiting |